Dodge 4500 Ram Chassis Cab vehicle Installation Guide Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 22
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
3
PTO Quick Start Information
This section will give you specific instructions on how to wire a PTO on the 2013 3500/4500/5500
models. The information is tailored toward those familiar with PTO installation on the 2007 to 2012 but
can be equally helpful to anyone installing a PTO.
Wire Locations
There are two connectors under the dash which are used. They are the same connectors as previous
years, but their locations are altered.
Both of these connectors are located behind the VISM module towards the front of the vehicle. The
VISM module is the black plastic module next to the park brake bracket . The view above shows the
connectors on a vehicle that does not have a VISM module as it would block the view of these
connectors. The white connector is ‘tear taped’ in place and can be accessed by pulling the connector
and tearing the tape without pulling on the wires themselves. The gray connector is tie wrapped in
place so the tie wrap must be cut to access the gray connector.
White
Connector
Gray
Connector
Main Menu
Index
IN
+
OUT
-
ALL
Chassis Cab Home
2014 Chassis Cab PTO Operation & Installation Guide
08/01/2013
Page view 2
1 2 3 4 5 6 7 8 ... 21 22

Comments to this Manuals

No comments